Preparation roadmap

Seven stages: from a readiness self-assessment to a public LVCS registry entry. Each stage lists its owner, duration, output artifact and preparation tips.


The path is end-to-end: self-assessment -> AOC -> public LVCS listing. Durations are indicative and depend on the target level and the current state of controls.

On this page

Owner

Duration

Output artifact

Tip

01 —From self-assessment to an LVCS listing

Preparation roadmap

Seven stages: from a readiness self-assessment to a public LVCS registry entry. Each stage lists its owner, duration, output artifact and preparation tips.

1
Stage 1. Self-assessment (SAQ-derived)
OwnerClient (CISO / Compliance Officer)2–4 weeks

Output artifact

Completed readiness checklist, gap list, candidate level.

Tip

Start from the segment you actually operate in (C.1–C.4). First map your existing PCI DSS / ГОСТ 57580 / SOC 2 controls — some carry over (Section A). The 8 Critical Requirements (B.1.1, B.1.2, B.2.1, B.3.1, B.4.1, B.5.2, B.7.3, B.8.1) never carry over and must pass via the Defined Approach — check them first.

2
Stage 2. Scoping and baseline carry-over
OwnerClient + chosen CCSAC (pre-engagement)1–2 weeks

Output artifact

Documented CCM scope, data-flow, baseline mapping (multi-baseline if PCI + ГОСТ).

Tip

Maintain a CCM Inventory (6 categories A–F, 10 mandatory fields) before the auditor arrives — B.1 is a Critical domain, and a stale inventory fails fast.

3
Stage 3. Gap remediation
OwnerClient engineering and security1–4 months (level-dependent)

Output artifact

Remediated controls, evidence package, Compensating Controls documented where used.

Tip

Compensating Controls have per-level limits and some are fully forbidden — do not plan CC for Critical Requirements. Cold/warm/hot tiering and AEAD at rest (B.3) are common, expensive fixes — budget early.

4
Stage 4. Choose an accredited CCSAC
OwnerClient procurement1–2 weeks

Output artifact

Signed CCSAC engagement; verify the CCSAC is accredited for your segment AND level.

Tip

Check the public CCSAC registry for segment (C.1–C.4) and level (L1/L2/L3) scope. L3 needs a CCSAC with 5+ CCSA-QSA and 2+ Lead Auditors. Mind the 2-year cooling-off: a firm that recently consulted you cannot audit you.

5
Stage 5. Formal CCSA assessment (audit)D.4
OwnerCCSAC (CCSA-QSA team, Lead Auditor signs)2–6 weeks, on-site/remote

Output artifact

ROC (Report on Compliance) — confidential. Methodology In Place / Not in Place / N/A / CC, no numeric scoring.

Tip

The ROC is fact-based, not narrative — provide observable evidence (on-chain data, configs, ceremony logs). For Critical Requirements the safe path is the Defined Approach.

6
Stage 6. AOC issuance
OwnerLead Auditor + client signabout 1 week

Output artifact

AOC (Attestation of Compliance) with a public summary; the ROC stays confidential.

Tip

The AOC is the public artifact your LVCS entry links to — review the public-summary wording before sign-off.

7
Stage 7. Public LVCS listing
OwnerClient (or CCSAC) submits the LVCS Application; Council verifies the ROC5–10 business days

Output artifact

LVCS Certificate ID + CCSA Badge + public registry entry; the right to use the CCSA Listed logo with the level.

Tip

The badge must always show the level (Level 1/2/3) — a generic "CCSA Certified" without a level is forbidden. The annual maintenance fee keeps the status active. Re-certification is annual and usually lighter than the first pass.


Critical

A certificate is valid for one year. Annual re-assessment applies to every level (Section D.4): stage 7 loops back to stage 5.

75

Get certified

The path is end-to-end: self-assessment -> AOC -> public LVCS listing. Durations are indicative and depend on the target level and the current state of controls.